Project Portfolio

What We Have
Delivered

10+ major packages across 5 states — executed in black cotton soil, desert terrain, waterlogged zones, and rocky strata with India's leading EPC contractors.

300+
Foundations
50MW+
Solar Capacity
280 km
OFC Fiber
62 km
Pipeline
5+
States
10 projects
MPPTCL 132kV Indore–Dewas Transmission Line
Transmission132kV
Completed

MPPTCL 132kV Indore–Dewas Transmission Line

Dewas–Ujjain Corridor, Madhya Pradesh4.5 Months180 Foundations

180 pad & chimney foundations in expansive black cotton soil, stub setting ±3mm, earthing installation, cube testing documentation.

Client / EPC: KEC International Ltd.
Black cotton soil with anti-heave measures
M25 concrete — 2,400 m³ poured
Rework rate < 1.5%
Ahead of schedule by 12 days
PowerGrid 220kV Khandwa–Burhanpur Section
Transmission220kV
Completed

PowerGrid 220kV Khandwa–Burhanpur Section

Khandwa, Madhya Pradesh3.8 Months120 Foundations

120 foundations including 35 pile foundations for waterlogged paddy field crossings, IS 2911 load tests, earthing across 38 km route.

Client / EPC: Kalpataru Power Transmission Ltd.
35 bored pile foundations — 450mm dia, 9–12m depth
Dewatering with submersible pumps
IS 2911 load test — 100% pass rate
All earthing resistance < 5 Ω
RVUNL 132kV Jodhpur–Barmer Evacuation Line
Transmission132kV
Completed

RVUNL 132kV Jodhpur–Barmer Evacuation Line

Barmer, Rajasthan5 Months140 Foundations

140 pad & chimney foundations in sandy desert terrain, wind load uplift design — IS 875 Zone V, anti-sand erosion protection.

Client / EPC: L&T Construction (Power Transmission & Distribution)
Sandy desert soil — SBC 80 kN/m²
Temporary wind shielding for concrete curing
Geotextile erosion protection around pads
Final acceptance first-pass by RVUNL QC
Rewa Ultra Mega Solar Park — Piling & Civil
Solar33kV Evacuation
Completed

Rewa Ultra Mega Solar Park — Piling & Civil

Rewa, Madhya Pradesh6 Months25 MW

6,200 driven GI pipe piles (76mm) for single-axis tracker MMS, inverter plinth, transformer pad, HT cable trench 8.4 km, access road 3.2 km.

Client / EPC: Adani Green Energy Ltd.
6,200 piles driven — avg 450 piles/day
Pull-out test: 100% above design load
Zero MMS misalignment noted at inspection
Access road with WBM + primer seal
Neemuch Solar Park — Piling, Trenching & BOP
Solar11kV Interconnection
Completed

Neemuch Solar Park — Piling, Trenching & BOP

Neemuch, Madhya Pradesh4 Months10 MW

3,800 auger piles, HT/LT cable trench 14.2 km, sand bedding and brick protection, transformer plinth M25, O&M building civil.

Client / EPC: NTPC Renewable Energy Ltd.
Auger piling in Vindhyan limestone strata
14.2 km cable trench — GPS as-built recorded
NTPC zero-punch-list final inspection
O&M building handed over 2 weeks early
Agar-Malwa Ground-Mount Solar — Full BOP Civil
Solar33kV Evacuation
Completed

Agar-Malwa Ground-Mount Solar — Full BOP Civil

Agar-Malwa, Madhya Pradesh5 Months15 MW

4,600 driven piles, access road 5.1 km WBM, perimeter drain, 3 inverter station plinths, earthing grid, security compound wall 1.8 km.

Client / EPC: Greenko Group
Black cotton soil zone — gel pile treatment used
5.1 km WBM road — DCP tested ≥ 98%
Earthing resistance < 1 Ω at all 3 inverter stations
Compound wall 1.8 km — 14 days ahead of schedule
Indus Towers GBT Rollout — Central MP Cluster
Telecom
Completed

Indus Towers GBT Rollout — Central MP Cluster

Indore, Ujjain, Dewas, Ratlam — MP Cluster8 Months45 Towers

45 Ground-Based Tower foundations, tower erection to 40m, BTS shelter civil, earthing per IS 3043, RFT sign-off.

Client / EPC: Indus Towers Ltd. (via EPC partner)
All 45 foundations RFT accepted first-pass
Average civil completion: 4 days/tower
BTS shelter civil with cable management
IS 3043 earthing — resistance < 2 Ω all sites
BharatNet Phase II OFC — MP Rural Districts
Telecom
Completed

BharatNet Phase II OFC — MP Rural Districts

Mandla, Dindori — Tribal MP10 Months280 km OFC

OFC trenching 280 km, HDPE conduit laying DN100, fiber blowing, fusion splicing, OTDR testing, GPs connected in Mandla & Dindori districts.

Client / EPC: BBNL / State EPC Agency
280 km mechanized JCB trenching
98 gram panchayats connected
Splice loss avg 0.08 dB/splice (spec ≤ 0.1)
OTDR acceptance sign-off 100%
NHAI Project Site Road & Drainage — MP Section
Civil
Completed

NHAI Project Site Road & Drainage — MP Section

NH-52 Corridor, Madhya Pradesh7 Months18.5 km Road

Access road 18.5 km WBM + primer seal, RCC box culverts NW-3 × 6 nos., side drain 22 km, retaining walls 480m, compaction DCP ≥ 98%.

Client / EPC: Infrastructure Developer (Confidential)
MoRT&H compliant GSB/WMM pavement
6 RCC box culverts NW-3 — no post-rain damage
Retaining wall 480m — slope stability verified
DCP compaction ≥ 98% — field lab on site
Jal Jeevan Mission — Rural Water Supply, Sehore District
Pipeline
Completed

Jal Jeevan Mission — Rural Water Supply, Sehore District

Sehore District, Madhya Pradesh9 Months62 km Pipeline

62 km HDPE PE100 pipeline DN63–250, butt fusion and electrofusion jointing, thrust blocks at 48 bends, hydrostatic testing 1.5x WP, GP connection chambers.

Client / EPC: MP Jal Nigam (via JJM EPC)
62 km laid — avg 250m/day with 2 JCB teams
48 thrust blocks — all bearing on natural ground
100% hydrostatic test pass — zero leaks
28 gram panchayats connected to tap water