Reinforced concrete pad and chimney foundations for self-supporting lattice towers. Designed per IS 2911 for normal to medium soils.
Bored cast-in-situ pile foundations for poor bearing capacity soils, waterlogged zones, and expansive black cotton soil areas.
Grouted rock anchor systems for hilly terrain and exposed rocky strata where conventional excavated foundations are uneconomical.
Counterpoise earthing, plate/pipe earthing, grid earthing (substation), control room plinths, equipment pedestals, cable trenches, drainage.
Route survey support & tower spotting assistance
Excavation (manual/mechanized) & dewatering
PCC (1:4:8) → reinforcement & formwork
Stub/template alignment ±3mm tolerance
RCC (M20/M25) pour with vibrators
Curing 7–14 days → backfilling & compaction
Earthing installation & resistance testing
Single and double circuit T-lines
State transmission backbone
Interstate grid strengthening
National grid UHVAC corridors