IS code compliant processes at every stage. Every foundation we execute is documented, tested, and handed over with complete quality records — no shortcuts.
Structural drawings reviewed against IS codes. Bar bending schedules checked before steel cutting. Concrete mix design approved before batching.
Cement and aggregate testing at source before delivery. Steel mill test certificates verified against IS 1786 / IS 2062 requirements.
Cover block placement, lap splice lengths, and stirrup spacing verified against BBS. Shuttering alignment checked before concreting.
Cube samples taken every 25 cubic metres. 7-day and 28-day tests at NABL-accredited labs. All results logged against batch and location.
Foundation dimensions, chimney plumb, and stub setting verified against approved drawings using total station and plumb bob.
As-built drawings, cube test records, material test certificates, and QC checklists compiled into handover dossier for EPC client.
Plain & Reinforced Concrete Code
High Strength Deformed Steel Bars
Code for Pile Foundations
Code for Design Loads
Specification for Coarse & Fine Aggregate
Method for Concrete Testing
Concrete cube test reports (7-day & 28-day)
Material test certificates (cement, steel, aggregate)
As-built foundation drawings with dimensions
Photographic progress records (day-wise)
Soil investigation summary (if carried out)
Completion certificate signed by site engineer
QC checklist for each foundation location
Stub setting verification record