Driven & auger piling, MMS foundations, cable trenches, wind turbine civil, and balance-of-plant works for utility-scale renewable energy projects.
Get a Quote50MW+ Executed
Solar capacity
300–800 Piles/Day
Machine dependent
MMS Zero Misalignment
Survey verified
72-Hr Mobilization
Post LOA
Driven & auger piling for module mounting structures. GI/MS pipe pile driving with verticality control, pull-out testing.
Large diameter RCC foundations, anchor cage placement, cable route trenches for wind turbine towers.
Inverter/transformer/switchgear plinths, control room, cable trenches with sand bedding and brick protection.
Land grading, internal access roads, perimeter drain, stormwater management, O&M building civil.
Fast piling teams, own equipment, geotech-compliant execution for solar and wind EPC civil packages.
Get a Quote