Specialized solar piling, MMS foundations, cable trenching & BOP civil contractor serving Rewa, Neemuch, Agar-Malwa, Shajapur, and all MP corridors. 50MW+ executed. Indore-based, 72-hour mobilization.
76mm & 90mm OD GI pipe driven piling for single & dual axis trackers. 300–800 piles/day depending on soil. Pull-out tested per geotech specs.
For rocky zones in Vindhyan formations (Rewa, Satna) — continuous auger piling 150–250mm dia, grouted anchors.
Inverter, transformer, and switchgear plinths; cable trenches with sand bedding; earthing grid; control room civil.
Land grading, access roads (WBM), perimeter fencing foundation, stormwater drain, O&M building.
Driven GI pipe piling (6,200 piles), MMS foundations, inverter station civil
Auger piling 3,800 piles, HT/LT cable trenches 14 km, transformer plinth
Ground-mounted piling, access road formation, control room civil
Inverter/transformer foundations, earthing grid, stormwater drains
Share scope, MW capacity, and location — we respond in 24 hours with capacity confirmation and quote.
skngrp@gmail.com +91 93405 83565Central MP (Rewa, Agar, Shajapur) has expansive black cotton soil (Vertisols) requiring deeper 1.8–2.4m driven piles and higher pull-out testing. Northern MP (Neemuch, Mandsaur) has sandy loam with better bearing capacity, enabling standard 1.5–1.8m piles. We assess geotech reports site-by-site.
Yes. We manage monsoon execution with proper drainage, dewatering, and adjusted pile driving schedules. Our equipment is equipped for wet soil conditions common in July–September in MP.
From our Indore HQ, we can mobilize crews anywhere in MP within 24–48 hours. Full equipment mobilization takes 72 hours post-LOA.
Yes — complete BOP civil including access road formation, perimeter drain, stormwater channels, O&M building RCC structure, and security cabin civil works.
From Rewa to Neemuch — complete solar civil execution with 72-hour mobilization from Indore.